Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP OMB Elbląg

Poland · official identifier PLWM0020

165,000h-e design capacity (2022) · 61st of 1,654 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLWM0020 · reported size 165,000 h-e design capacity · received load 135,477 h-e · reported treatment: PST · data year 2022. 61st of 1,654 records with reported size in the inventory of Poland (tied with 1 others); 0.31 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

165,000h-e design capacity
135,477h-e received load (2022)
82 %reported load/capacity ratio (not hydraulic utilisation)
61st of 1,654by reported size among the 1,654 records with a size in the inventory (tied with 1 others) · 0.31 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates54.2000, 19.3831 precision reported by the source: level 0 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Elbląg): 103,530 inhabitants (2024, Polish Waters).

Documented milestones

  • 2024-06-22 · The plant permit (GD.RUZ.4210.283.2023.6.MM) became final, according to the national report. Polish Waters

Other published data

Mean annual volume treated reported in the 2022 cycle6,481,000 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,245,499reference kWh per year for this load
30.7kWh per h-e (average load) per year
486,825€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 135,477 p.e. of reported load; equivalent average load 105,594 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

5.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (14,632 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Przywidz15.5 km5,2464,653primary and secondary
Tolkmicko16.1 km10,0006,933primary and secondary
Pasłęk17.7 km14,58312,500primary, secondary and tertiary
Krynica Morska18.8 km21,70020,528primary, secondary and tertiary
Stegna19.5 km41,70025,806primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP OMB Elbląg report?

Reported size: 165,000 h-e design capacity. Received load: 135,477 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of OMB Elbląg?

Aguas SB simulator reference scenario for 135,477 p.e. of reported load: 3,245,499 kWh per year (30.7 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.