Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP OŚ Libiąż A

Poland · official identifier PLMP5040

16,900h-e design capacity (2022) · 483rd of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLMP5040 · reported size 16,900 h-e design capacity · received load 8,305 h-e · reported treatment: PS · data year 2022. 483rd of 1,654 records with reported size in the inventory of Poland; 0.03 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.2 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,900h-e design capacity
8,305h-e received load (2022)
49 %reported load/capacity ratio (not hydraulic utilisation)
483rd of 1,654by reported size among the 1,654 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.1168, 19.3134 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

261,264reference kWh per year for this load
40.4kWh per h-e (average load) per year
39,190€ per year at 0.15 €/kWh
53 %share of energy used for aeration

what this estimate is · Inputs: 8,305 p.e. of reported load; equivalent average load 6,473 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (897 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oś Libiąż B4.2 km10,8978,455primary and secondary
Goś Chrzanów4.5 km99,99959,398primary, secondary and tertiary
Oczyszczalnia Dąb4.5 km125,000102,388primary, secondary and tertiary
Imielin7.8 km8,0007,331primary and secondary
Miejsko – Przemysłowa Oczyszczalnia Ścieków8.8 km94,50090,189primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP OŚ Libiąż A report?

Reported size: 16,900 h-e design capacity. Received load: 8,305 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of OŚ Libiąż A?

Aguas SB simulator reference scenario for 8,305 p.e. of reported load: 261,264 kWh per year (40.4 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.