Worldwide wastewater treatment observatory · Poland
Aguas SB Observatory · public data to understand water
WWTP Osówiec
Poland · official identifier PLWL1220
3,800h-e design capacity (2022) · 1327th of 1,654 (tied with 2 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLWL1220 · reported size 3,800 h-e design capacity · received load 2,004 h-e · reported treatment: PS · data year 2022. 1327th of 1,654 records with reported size in the inventory of Poland (tied with 2 others); < 0.01 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.2914, 18.0319 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Poland
Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,004 p.e. of reported load; equivalent average load 1,559 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (216 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Golina | 5.6 km | 8,667 | 6,824 | primary and secondary |
| Gostuń | 10.2 km | 3,200 | 2,650 | primary and secondary |
| Kazimierz Biskupi | 10.3 km | 13,500 | 8,729 | primary and secondary |
| Oczyszczalnia Ścieków W Słupcy | 10.7 km | 15,870 | 13,586 | primary, secondary and tertiary |
| Kleczew | 12.5 km | 5,600 | 4,306 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Osówiec report?
Reported size: 3,800 h-e design capacity. Received load: 2,004 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Osówiec?
Aguas SB simulator reference scenario for 2,004 p.e. of reported load: 73,925 kWh per year (47.4 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.