Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Piątkowa

Poland · official identifier PLMP0983

950h-e design capacity (2022) · 1608th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLMP0983 · reported size 950 h-e design capacity · received load 824 h-e · reported treatment: PS · data year 2022. 1608th of 1,654 records with reported size in the inventory of Poland; < 0.01 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.8 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

950h-e design capacity
824h-e received load (2022)
87 %reported load/capacity ratio (not hydraulic utilisation)
1608th of 1,654by reported size among the 1,654 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.6213, 20.7503 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

34,023reference kWh per year for this load
53.0kWh per h-e (average load) per year
5,103€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 824 p.e. of reported load; equivalent average load 642 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (89 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Mała Wieś5.8 km4,2633,764primary and secondary
Komunalna Oczyszczalnia Ścieków W Nowym Sączu6.3 km180,000174,242primary, secondary and tertiary
Chełmiec6.6 km6,2044,184primary and secondary
Wielogłowy7.6 km11,4436,242primary and secondary
Oczyszczalnia Ścieków W Miejscowości Ptaszkowa8.0 km7,5001,850primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Piątkowa report?

Reported size: 950 h-e design capacity. Received load: 824 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Piątkowa?

Aguas SB simulator reference scenario for 824 p.e. of reported load: 34,023 kWh per year (53.0 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.