Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Pomarzany Fabryczne – działki ewid. nr 37/1, 38/1, 38/2, 38/

Poland · official identifier PLWL0500

14,536h-e design capacity (2022) · 536th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLWL0500 · reported size 14,536 h-e design capacity · received load 6,326 h-e · reported treatment: PS · data year 2022. 536th of 1,654 records with reported size in the inventory of Poland; 0.03 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 17.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

14,536h-e design capacity
6,326h-e received load (2022)
44 %reported load/capacity ratio (not hydraulic utilisation)
536th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates52.2486, 18.8939 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

218,566reference kWh per year for this load
44.3kWh per h-e (average load) per year
32,785€ per year at 0.15 €/kWh
76 %share of energy used for aeration

what this estimate is · Inputs: 6,326 p.e. of reported load; equivalent average load 4,929 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (683 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Gminna Oczyszczalnia Ścieków W Poloniszu17.6 km5,0003,655primary and secondary
Oczyszczalnia Ścieków W Łęczycy Przy Ulicy K. Odnowiciela18.8 km27,00016,477primary, secondary and tertiary
Mielno-Lubieniec19.9 km5,1352,298primary and secondary
Pawlikowice20.2 km9,9998,686primary and secondary
Koło20.2 km84,34845,979primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Pomarzany Fabryczne – działki ewid. nr 37/1, 38/1, 38/2, 38/ report?

Reported size: 14,536 h-e design capacity. Received load: 6,326 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Pomarzany Fabryczne – działki ewid. nr 37/1, 38/1, 38/2, 38/?

Aguas SB simulator reference scenario for 6,326 p.e. of reported load: 218,566 kWh per year (44.3 kWh per p.e. of average load), with aeration as 76 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.