Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Zdroje

Poland · official identifier PLZA0012

177,000h-e design capacity (2022) · 57th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLZA0012 · reported size 177,000 h-e design capacity · received load 89,377 h-e · reported treatment: PST · data year 2022. 57th of 1,654 records with reported size in the inventory of Poland; 0.33 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

177,000h-e design capacity
89,377h-e received load (2022)
50 %reported load/capacity ratio (not hydraulic utilisation)
57th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.33 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates53.3825, 14.6211 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Szczecin Prawobrzeże): 68,578 inhabitants (2024, Polish Waters).

Documented milestones

  • 2024-08-27 · The national programme recorded technical acceptance of a type RM investment at the plant. Polish Waters

Other published data

Mean annual volume treated reported in the 2022 cycle4,914,000 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,328,062reference kWh per year for this load
33.4kWh per h-e (average load) per year
349,209€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 89,377 p.e. of reported load; equivalent average load 69,662 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

3.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (9,653 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Pomorzany5.6 km418,000337,972primary, secondary and tertiary
Przecław9.2 km13,55812,943primary, secondary and tertiary
Zabierzewo14.2 km4,2002,866primary and secondary
Oczyszczalnia Ścieków Gryfino15.2 km56,45025,046primary, secondary and tertiary
Oczyszczalnia Ścieków Redlica16.7 km36,00024,065primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Zdroje report?

Reported size: 177,000 h-e design capacity. Received load: 89,377 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Zdroje?

Aguas SB simulator reference scenario for 89,377 p.e. of reported load: 2,328,062 kWh per year (33.4 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.