Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Zwierzyniec

Poland · official identifier PLLE0310

5,400h-e design capacity (2022) · 1098th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLLE0310 · reported size 5,400 h-e design capacity · received load 5,851 h-e · reported treatment: PS · data year 2022. 1098th of 1,654 records with reported size in the inventory of Poland; 0.01 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,400h-e design capacity
5,851h-e received load (2022)
108 %reported load/capacity ratio (not hydraulic utilisation)
1098th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates50.6170, 22.7957 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

203,006reference kWh per year for this load
44.5kWh per h-e (average load) per year
30,451€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 5,851 p.e. of reported load; equivalent average load 4,561 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (632 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Tereszpol6.7 km3,5853,704primary and secondary
Frampol11.3 km2,2422,104primary and secondary
Biłgoraj12.3 km80,40042,141primary, secondary and tertiary
Szczebrzeszyn18.0 km8,0005,469primary and secondary
Józefów · Plle080023.0 km3,2872,908primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Zwierzyniec report?

Reported size: 5,400 h-e design capacity. Received load: 5,851 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Zwierzyniec?

Aguas SB simulator reference scenario for 5,851 p.e. of reported load: 203,006 kWh per year (44.5 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.