Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP ZWK Oczyszczalnia w Iwierzycach

Poland · official identifier PLPK1170

7,050h-e design capacity (2022) · 931st of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLPK1170 · reported size 7,050 h-e design capacity · received load 4,281 h-e · reported treatment: PS · data year 2022. 931st of 1,654 records with reported size in the inventory of Poland; 0.01 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,050h-e design capacity
4,281h-e received load (2022)
61 %reported load/capacity ratio (not hydraulic utilisation)
931st of 1,654by reported size among the 1,654 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates50.2246, 21.4442 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

150,667reference kWh per year for this load
45.2kWh per h-e (average load) per year
22,600€ per year at 0.15 €/kWh
74 %share of energy used for aeration

what this estimate is · Inputs: 4,281 p.e. of reported load; equivalent average load 3,334 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (462 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Mechaniczno-Biologiczna Oczyszczalnia Ścieków W Błoniu3.6 km9,8746,144primary and secondary
Ruda i7.3 km300272primary and secondary
Kolbuszowa7.8 km40,00013,615primary, secondary and tertiary
Oczyszczalnia Ścieków W Mielcu8.8 km85,75072,427primary, secondary and tertiary
Ruda9.1 km225128primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ZWK Oczyszczalnia w Iwierzycach report?

Reported size: 7,050 h-e design capacity. Received load: 4,281 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ZWK Oczyszczalnia w Iwierzycach?

Aguas SB simulator reference scenario for 4,281 p.e. of reported load: 150,667 kWh per year (45.2 kWh per p.e. of average load), with aeration as 74 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.