Worldwide wastewater treatment observatory · Portugal
Aguas SB Observatory · public data to understand water
WWTP Ameal
Portugal · official identifier PT18694877
4,000h-e design capacity (2022) · 364th of 527 (tied with 4 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT18694877 · reported size 4,000 h-e design capacity · received load 1,100 h-e · reported treatment: PST · data year 2022. 364th of 527 records with reported size in the inventory of Portugal (tied with 4 others); 0.02 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.7 km · 12 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 40.1976, -8.5309 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,100 p.e. of reported load; equivalent average load 1,100 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (220 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| S. Martinho da Arvore | 2.7 km | 6,500 | 3,500 | primary and secondary |
| S. Silvestre | 3.3 km | 11,667 | 4,600 | primary, secondary and tertiary |
| Rib.De Frades | 3.7 km | 45,000 | 22,000 | primary and secondary |
| Pereira do Campo II | 4.5 km | 3,000 | 1,250 | primary and secondary |
| Pereira do Campo i | 4.6 km | 2,832 | 1,250 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Ameal report?
Reported size: 4,000 h-e design capacity. Received load: 1,100 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Ameal?
Aguas SB simulator reference scenario for 1,100 p.e. of reported load: 56,643 kWh per year (51.5 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.