WWTP Campo Maior Oeste
Portugal · official identifier PT8040107
4,000h-e design capacity (2022) · 364th of 527 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT8040107 · reported size 4,000 h-e design capacity · received load 1,900 h-e · reported treatment: PS · data year 2022. 364th of 527 records with reported size in the inventory of Portugal (tied with 4 others); 0.02 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 39.0006, -7.0794 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,900 p.e. of reported load; equivalent average load 1,900 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (380 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Campo Maior Este | 1.5 km | 7,300 | 6,300 | primary and secondary |
| Elvas | 14.8 km | 19,000 | 17,000 | primary, secondary and tertiary |
| Arronches | 21.5 km | 2,733 | 2,100 | primary and secondary |
| Terrugem | 29.6 km | 2,583 | 2,500 | primary, secondary and tertiary |
| Borba | 36.5 km | 8,000 | 8,000 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Campo Maior Oeste report?
Reported size: 4,000 h-e design capacity. Received load: 1,900 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Campo Maior Oeste?
Aguas SB simulator reference scenario for 1,900 p.e. of reported load: 93,925 kWh per year (49.4 kWh per p.e. of average load), with aeration as 68 % of consumption. Estimate with the country reference profile; not a measurement of the plant.