Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Espinho

Portugal · official identifier PT6031950

194,232h-e design capacity (2022) · 21st of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT6031950 · reported size 194,232 h-e design capacity · received load 87,000 h-e · reported treatment: PS · data year 2022. 21st of 527 records with reported size in the inventory of Portugal; 1.1 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

194,232h-e design capacity
87,000h-e received load (2022)
45 %reported load/capacity ratio (not hydraulic utilisation)
21st of 527by reported size among the 527 records with a size in the inventory · 1.1 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.9747, -8.6480 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2004-11-24 · A call for tenders was published to extend and refurbish the Espinho wastewater treatment plant next to Paramos beach. Official Gazette of Portugal

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,053,639reference kWh per year for this load
35.1kWh per h-e (average load) per year
458,046€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 87,000 p.e. of reported load; equivalent average load 87,000 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

6.4estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (17,400 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Remolha7.5 km8,8744,800primary and secondary
Fiaes /S. Jorge11.7 km46,00046,000primary and secondary
Argoncilhe11.9 km17,14713,900primary and secondary
Gaia Litoral15.3 km300,000300,000primary and secondary
Crestuma15.9 km5,0005,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Espinho report?

Reported size: 194,232 h-e design capacity. Received load: 87,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Espinho?

Aguas SB simulator reference scenario for 87,000 p.e. of reported load: 3,053,639 kWh per year (35.1 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.