Worldwide wastewater treatment observatory · Portugal
Aguas SB Observatory · public data to understand water
WWTP ETAR Norte (Coimbrao)
Portugal · official identifier PT20730368
156,701h-e design capacity (2022) · 27th of 527
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT20730368 · reported size 156,701 h-e design capacity · received load 125,100 h-e · reported treatment: PST · data year 2022. 27th of 527 records with reported size in the inventory of Portugal; 0.91 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 39.8938, -8.9115 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2008-11-19 · The North wastewater treatment plant in the parish of Coimbrão, Leiria, was inaugurated. Municipality of Leiria
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 125,100 p.e. of reported load; equivalent average load 125,100 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (25,020 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Vieira de Leiria | 3.0 km | 15,385 | 9,200 | primary and secondary |
| Praia de Pedrogao | 4.0 km | 16,000 | 16,000 | primary, secondary and tertiary |
| Guia_pombal | 9.9 km | 4,197 | 4,200 | primary and secondary |
| S. Pedro de Moel | 17.2 km | 9,587 | 3,500 | primary, secondary and tertiary |
| Zona Industrial Casal da Lebre | 19.2 km | 14,537 | 4,000 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ETAR Norte (Coimbrao) report?
Reported size: 156,701 h-e design capacity. Received load: 125,100 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of ETAR Norte (Coimbrao)?
Aguas SB simulator reference scenario for 125,100 p.e. of reported load: 4,079,735 kWh per year (32.6 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.