Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Frossos

Portugal · official identifier PT18063056

230,000h-e design capacity (2022) · 16th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT18063056 · reported size 230,000 h-e design capacity · received load 158,500 h-e · reported treatment: PST · data year 2022. 16th of 527 records with reported size in the inventory of Portugal; 1.3 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

230,000h-e design capacity
158,500h-e received load (2022)
69 %reported load/capacity ratio (not hydraulic utilisation)
16th of 527by reported size among the 527 records with a size in the inventory · 1.3 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates41.5666, -8.4458 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2009-02-19 · The extension and refurbishment of the Frossos wastewater treatment plant received a favourable environmental decision with conditions. Portuguese Environment Agency

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,931,587reference kWh per year for this load
31.1kWh per h-e (average load) per year
739,738€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 158,500 p.e. of reported load; equivalent average load 158,500 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

11.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (31,700 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Palmeira3.6 km32,0007,000primary, secondary and tertiary
Ruaes3.6 km20,00010,000primary, secondary and tertiary
Cavado/Homem5.1 km49,89128,500primary, secondary and tertiary
Cabreiros5.7 km6,9006,200primary and secondary
Celeiros6.4 km19,20019,200primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Frossos report?

Reported size: 230,000 h-e design capacity. Received load: 158,500 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Frossos?

Aguas SB simulator reference scenario for 158,500 p.e. of reported load: 4,931,587 kWh per year (31.1 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.