Worldwide wastewater treatment observatory · Portugal
Aguas SB Observatory · public data to understand water
WWTP Gelfa
Portugal · official identifier PT18060553
27,025h-e design capacity (2022) · 118th of 527
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT18060553 · reported size 27,025 h-e design capacity · received load 27,000 h-e · reported treatment: PST · data year 2022. 118th of 527 records with reported size in the inventory of Portugal; 0.16 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 41.7992, -8.8637 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 27,000 p.e. of reported load; equivalent average load 27,000 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (5,400 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Caminha | 8.1 km | 17,205 | 17,200 | primary and secondary |
| Viana do Castelo - Cidade | 10.3 km | 45,250 | 45,200 | primary, secondary and tertiary |
| Viana do Castelo - Zona Industrial | 16.1 km | 53,300 | 42,000 | primary, secondary and tertiary |
| Vila Nova de Cerveira | 17.4 km | 6,408 | 3,800 | primary, secondary and tertiary |
| Lanheses | 17.8 km | 9,546 | 9,500 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Gelfa report?
Reported size: 27,025 h-e design capacity. Received load: 27,000 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Gelfa?
Aguas SB simulator reference scenario for 27,000 p.e. of reported load: 1,175,049 kWh per year (43.5 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.