Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Lagos

Portugal · official identifier PT9033031

138,000h-e design capacity (2022) · 33rd of 527 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT9033031 · reported size 138,000 h-e design capacity · received load 106,500 h-e · reported treatment: PST · data year 2022. 33rd of 527 records with reported size in the inventory of Portugal (tied with 1 others); 0.80 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

138,000h-e design capacity
106,500h-e received load (2022)
77 %reported load/capacity ratio (not hydraulic utilisation)
33rd of 527by reported size among the 527 records with a size in the inventory (tied with 1 others) · 0.80 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates37.1222, -8.6873 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2024-06-05 · The upgrade to Lagos wastewater treatment plant was inaugurated on 5 June 2024. Municipality of Lagos

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,588,090reference kWh per year for this load
33.7kWh per h-e (average load) per year
538,214€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 106,500 p.e. of reported load; equivalent average load 106,500 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

7.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (21,300 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Burgau/Cardal9.4 km10,0008,000primary, secondary and tertiary
Companheira (Nova ETAR)15.0 km140,092140,000primary, secondary and tertiary
Mexilhoeira da Carregacao16.7 km9,4279,400primary and secondary
Boavista (Nova ETAR)19.4 km33,18017,800primary, secondary and tertiary
Silves20.7 km15,50015,500primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Lagos report?

Reported size: 138,000 h-e design capacity. Received load: 106,500 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Lagos?

Aguas SB simulator reference scenario for 106,500 p.e. of reported load: 3,588,090 kWh per year (33.7 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.