WWTP Paco de Sousa (Nova)

Portugal · official identifier PTAGL353tp01

64,600h-e design capacity (2022) · 60th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PTAGL353tp01 · reported size 64,600 h-e design capacity · received load 64,600 h-e · reported treatment: PST · data year 2022. 60th of 527 records with reported size in the inventory of Portugal; 0.37 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

64,600h-e design capacity
64,600h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
60th of 527by reported size among the 527 records with a size in the inventory · 0.37 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates41.1751, -8.3414 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,408,249reference kWh per year for this load
37.3kWh per h-e (average load) per year
361,237€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 64,600 p.e. of reported load; equivalent average load 64,600 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

4.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (12,920 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Termas S. Vicente7.9 km7,5005,500primary and secondary
Sousa8.3 km89,91324,000primary and secondary
Arreigada9.5 km16,00014,500primary, secondary and tertiary
S. Paio de Favoes11.1 km7,0004,000primary, secondary and tertiary
Campo (Valongo, Campo e Sobrado)11.1 km98,27884,500primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Paco de Sousa (Nova) report?

Reported size: 64,600 h-e design capacity. Received load: 64,600 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Paco de Sousa (Nova)?

Aguas SB simulator reference scenario for 64,600 p.e. of reported load: 2,408,249 kWh per year (37.3 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.