Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Ponte de Lima

Portugal · official identifier PT20424560

20,457h-e design capacity (2022) · 140th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT20424560 · reported size 20,457 h-e design capacity · received load 19,800 h-e · reported treatment: PS · data year 2022. 140th of 527 records with reported size in the inventory of Portugal; 0.12 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

20,457h-e design capacity
19,800h-e received load (2022)
97 %reported load/capacity ratio (not hydraulic utilisation)
140th of 527by reported size among the 527 records with a size in the inventory · 0.12 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates41.7615, -8.6048 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

863,710reference kWh per year for this load
43.6kWh per h-e (average load) per year
129,556€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 19,800 p.e. of reported load; equivalent average load 19,800 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.4estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (3,960 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Lanheses5.7 km9,5469,500primary, secondary and tertiary
Neiva11.9 km3,0923,000primary, secondary and tertiary
Ponte da Barca14.9 km6,7766,100primary and secondary
Barroselas16.7 km12,9006,400primary, secondary and tertiary
Arcos de Valdevez16.8 km9,5679,200primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Ponte de Lima report?

Reported size: 20,457 h-e design capacity. Received load: 19,800 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Ponte de Lima?

Aguas SB simulator reference scenario for 19,800 p.e. of reported load: 863,710 kWh per year (43.6 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.