Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Riachos

Portugal · official identifier PT7055446

16,137h-e design capacity (2022) · 163rd of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT7055446 · reported size 16,137 h-e design capacity · received load 14,500 h-e · reported treatment: PST · data year 2022. 163rd of 527 records with reported size in the inventory of Portugal; 0.09 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.1 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,137h-e design capacity
14,500h-e received load (2022)
90 %reported load/capacity ratio (not hydraulic utilisation)
163rd of 527by reported size among the 527 records with a size in the inventory · 0.09 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates39.4202, -8.5092 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

636,684reference kWh per year for this load
43.9kWh per h-e (average load) per year
95,503€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 14,500 p.e. of reported load; equivalent average load 14,500 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (2,900 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Entroncamento4.1 km25,00023,400primary and secondary
Golega4.3 km6,5004,100primary, secondary and tertiary
Torres Novas4.5 km34,93132,800primary, secondary and tertiary
Vila Nova da Barquinha6.3 km10,7936,000primary and secondary
Carregueira/Pinheiro Grande6.6 km7,1784,400primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Riachos report?

Reported size: 16,137 h-e design capacity. Received load: 14,500 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Riachos?

Aguas SB simulator reference scenario for 14,500 p.e. of reported load: 636,684 kWh per year (43.9 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.