Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Rib. de Moinhos

Portugal · official identifier PT20501079

360,000h-e design capacity (2022) · 6th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT20501079 · reported size 360,000 h-e design capacity · received load 105,000 h-e · reported treatment: PS · data year 2022. 6th of 527 records with reported size in the inventory of Portugal; 2.1 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 13.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

360,000h-e design capacity
105,000h-e received load (2022)
29 %reported load/capacity ratio (not hydraulic utilisation)
6th of 527by reported size among the 527 records with a size in the inventory · 2.1 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates37.9844, -8.8498 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025-02-21 · The Government announced that it would promote reuse of treated water from Ribeira de Moinhos as part of a scheme in Sines. Government of Portugal

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,547,729reference kWh per year for this load
33.8kWh per h-e (average load) per year
532,159€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 105,000 p.e. of reported load; equivalent average load 105,000 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

7.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (21,000 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Porto Covo13.5 km10,00010,000primary, secondary and tertiary
Cercal do Alentejo25.3 km3,0003,000primary and secondary
Vila Nova de Milfontes29.0 km15,00012,500primary, secondary and tertiary
Grandola35.6 km9,4509,400primary and secondary
Almograve /Longueira36.9 km9,5009,500primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Rib. de Moinhos report?

Reported size: 360,000 h-e design capacity. Received load: 105,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Rib. de Moinhos?

Aguas SB simulator reference scenario for 105,000 p.e. of reported load: 3,547,729 kWh per year (33.8 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.