Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Vila Nova de Ancos

Portugal · official identifier PT14031806

2,370h-e design capacity (2022) · 500th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT14031806 · reported size 2,370 h-e design capacity · received load 2,300 h-e · reported treatment: PS · data year 2022. 500th of 527 records with reported size in the inventory of Portugal; 0.01 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,370h-e design capacity
2,300h-e received load (2022)
97 %reported load/capacity ratio (not hydraulic utilisation)
500th of 527by reported size among the 527 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.1069, -8.6337 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

112,088reference kWh per year for this load
48.7kWh per h-e (average load) per year
16,813€ per year at 0.15 €/kWh
69 %share of energy used for aeration

what this estimate is · Inputs: 2,300 p.e. of reported load; equivalent average load 2,300 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (460 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Soure4.4 km3,9613,900primary and secondary
Formoselha/Santo Varao7.4 km3,6002,200primary and secondary
Montemor-O-Velho8.5 km3,0002,400primary and secondary
Pereira do Campo i10.1 km2,8321,250primary and secondary
Pereira do Campo II10.1 km3,0001,250primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Vila Nova de Ancos report?

Reported size: 2,370 h-e design capacity. Received load: 2,300 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Vila Nova de Ancos?

Aguas SB simulator reference scenario for 2,300 p.e. of reported load: 112,088 kWh per year (48.7 kWh per p.e. of average load), with aeration as 69 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.