Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Vila Verde

Portugal · official identifier PT12032824

5,050h-e design capacity (2022) · 329th of 527

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT12032824 · reported size 5,050 h-e design capacity · received load 4,100 h-e · reported treatment: PS · data year 2022. 329th of 527 records with reported size in the inventory of Portugal; 0.03 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.1 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,050h-e design capacity
4,100h-e received load (2022)
81 %reported load/capacity ratio (not hydraulic utilisation)
329th of 527by reported size among the 527 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates38.8301, -9.3524 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

192,545reference kWh per year for this load
47.0kWh per h-e (average load) per year
28,882€ per year at 0.15 €/kWh
72 %share of energy used for aeration

what this estimate is · Inputs: 4,100 p.e. of reported load; equivalent average load 4,100 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (820 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cavaleira2.1 km9,0005,000primary and secondary
Montelavar3.0 km18,0008,500primary and secondary
Sabugo4.2 km2,5002,500primary and secondary
Ribeira de Colares-S25.0 km35,00033,100primary and secondary
Negrais7.7 km2,1103,900primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Vila Verde report?

Reported size: 5,050 h-e design capacity. Received load: 4,100 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Vila Verde?

Aguas SB simulator reference scenario for 4,100 p.e. of reported load: 192,545 kWh per year (47.0 kWh per p.e. of average load), with aeration as 72 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.