Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP CENTRU ZONAL JUDET BACAU - SECTIA MOINESTI

Romania · official identifier ROWP_20885_01

26,520h-e design capacity (2022) · 109th of 1,622

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_20885_01 · reported size 26,520 h-e design capacity · received load 5,261 h-e · reported treatment: PST · data year 2022. 109th of 1,622 records with reported size in the inventory of Romania; 0.11 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

26,520h-e design capacity
5,261h-e received load (2022)
20 %reported load/capacity ratio (not hydraulic utilisation)
109th of 1,622by reported size among the 1,622 records with a size in the inventory · 0.11 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.4712, 26.4847 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

132,789reference kWh per year for this load
56.0kWh per h-e (average load) per year
19,918€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 5,261 p.e. of reported load; equivalent average load 2,372 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (842 m³/day of reference), not measured or available for reclamation.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Seau Trotus6.2 km25,00024,088primary, secondary and tertiary
Centrul Zonal Judet Bacau - Seau Magiresti6.4 km2,97563primary, secondary and tertiary
Rowp Comuna Zemes - Statie Epurare Zemes8.3 km3,000629primary, secondary and tertiary
Rowp Sarata9.8 km6,5002,708primary and secondary
Centru Zonal Judet Bacau - Statia de Epurare Dar11.5 km6,838881primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CENTRU ZONAL JUDET BACAU - SECTIA MOINESTI report?

Reported size: 26,520 h-e design capacity. Received load: 5,261 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CENTRU ZONAL JUDET BACAU - SECTIA MOINESTI?

Aguas SB simulator reference scenario for 5,261 p.e. of reported load: 132,789 kWh per year (56.0 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.