Worldwide wastewater treatment observatory · Romania
Aguas SB Observatory · public data to understand water
WWTP MEDIAS ST EP
Romania · official identifier ROWP_143628_01
74,000h-e design capacity (2022) · 57th of 1,622
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_143628_01 · reported size 74,000 h-e design capacity · received load 29,110 h-e · reported treatment: PST · data year 2022. 57th of 1,622 records with reported size in the inventory of Romania; 0.32 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.2 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.1507, 24.3208 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 29,110 p.e. of reported load; equivalent average load 13,120 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,658 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rowp Bazna | 7.2 km | 2,830 | 54 | primary and secondary |
| Roco Spgcl Copsa Mica | 8.8 km | 12,300 | 463 | not reported |
| Rowp Mosna · Rowp_145113_01 | 8.9 km | 3,500 | 87 | primary and secondary |
| Rowp Comuna Bagaciu | 14.0 km | 1,500 | 893 | primary and secondary |
| Rowp Comuna Bagaciu Ev Deleni | 14.1 km | 1,234 | 1,003 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MEDIAS ST EP report?
Reported size: 74,000 h-e design capacity. Received load: 29,110 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of MEDIAS ST EP?
Aguas SB simulator reference scenario for 29,110 p.e. of reported load: 742,385 kWh per year (56.6 kWh per p.e. of average load), with aeration as 40 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.