Worldwide wastewater treatment observatory · Romania
Aguas SB Observatory · public data to understand water
WWTP MOLDOVA NOUA_EV HOTEL
Romania · official identifier ROCO_51065_02
1,000h-e design capacity (2022) · 1423rd of 1,622 (tied with 47 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROCO_51065_02 · reported size 1,000 h-e design capacity · received load 2,388 h-e · data year 2022. 1423rd of 1,622 records with reported size in the inventory of Romania (tied with 47 others); < 0.01 % of the sum of those 1,622 records in h-e (sum of records, not national capacity). Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 44.7324, 21.6740 approximate position · location awaiting cross-checking |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
Another record in the same inventory lies within 50 m: MOLDOVA NOUA · ROWP_51065_01. The source does not state whether it is the same facility.
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,388 p.e. of reported load; equivalent average load 1,076 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (382 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
Nearby plants are not shown: this plant's location awaits cross-checking.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MOLDOVA NOUA_EV HOTEL report?
Reported size: 1,000 h-e design capacity. Received load: 2,388 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of MOLDOVA NOUA_EV HOTEL?
Aguas SB simulator reference scenario for 2,388 p.e. of reported load: 64,774 kWh per year (60.2 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.