Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP OLTENIA CRAIOVA

Romania · official identifier RO4DJ_57

385,000h-e design capacity (2022) · 9th of 1,622

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier RO4DJ_57 · reported size 385,000 h-e design capacity · received load 268,374 h-e · reported treatment: PST · data year 2022. 9th of 1,622 records with reported size in the inventory of Romania; 1.7 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

385,000h-e design capacity
268,374h-e received load (2022)
70 %reported load/capacity ratio (not hydraulic utilisation)
9th of 1,622by reported size among the 1,622 records with a size in the inventory · 1.7 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates44.2630, 23.8230 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2014-11-20 · The sludge storage platform at Craiova’s Făcăi wastewater treatment plant was formally accepted. City of Craiova

Other published data

Mean annual volume treated reported in the 2022 cycle17,536,200 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,943,252reference kWh per year for this load
40.9kWh per h-e (average load) per year
741,488€ per year at 0.15 €/kWh
47 %share of energy used for aeration

what this estimate is · Inputs: 268,374 p.e. of reported load; equivalent average load 120,948 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

15.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (42,940 m³/day of reference), not measured or available for reclamation.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oltenia -Podari3.8 km5,0003,122primary and secondary
Oltenia -Carcea5.5 km4,0002,174primary and secondary
Rowp Breasta14.2 km2,4911,705primary and secondary
Rowp Isalnita15.2 km3,5732,103primary and secondary
Rowp Vulpeni21.1 km2,000732primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP OLTENIA CRAIOVA report?

Reported size: 385,000 h-e design capacity. Received load: 268,374 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of OLTENIA CRAIOVA?

Aguas SB simulator reference scenario for 268,374 p.e. of reported load: 4,943,252 kWh per year (40.9 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.