Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP ROCO Corbu

Romania · official identifier ROCO_84157_00

1,553h-e design capacity (2022) · 1299th of 1,622

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROCO_84157_00 · reported size 1,553 h-e design capacity · data year 2022. 1299th of 1,622 records with reported size in the inventory of Romania; < 0.01 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.2 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,553h-e design capacity
1299th of 1,622by reported size among the 1,622 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates46.9920, 25.6850 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Romaquaprest Borsec9.2 km5,0001,476primary and secondary
Rowp Comuna Tulghes - Seau Tulghes13.2 km3,5141,031primary and secondary
Tce Durau Bucuresti (Durau Ceahlau)21.3 km6,200916primary and secondary
Rowp Comuna Farcasa - Seau Farcasa22.2 km2,594427primary and secondary
Rowp Sarmas22.3 km1,847123primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROCO Corbu report?

Reported size: 1,553 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.