Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP ROWP Baleni · ROWP_66198_01

Romania · official identifier ROWP_66198_01

8,930h-e design capacity (2022) · 252nd of 1,622

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_66198_01 · reported size 8,930 h-e design capacity · data year 2022. 252nd of 1,622 records with reported size in the inventory of Romania; 0.04 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.3 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

8,930h-e design capacity
252nd of 1,622by reported size among the 1,622 records with a size in the inventory · 0.04 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates44.7940, 25.6610 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Rowp Comisani10.7 km1,2502,277primary, secondary and tertiary
Suc Il Caragia13.0 km6,5006,700primary and secondary
Apacris Instal 2012 I.L Caragiale- Suc Darmanesti16.0 km5,1331,189primary and secondary
Centrul Ti16.2 km18,70013,196primary, secondary and tertiary
Rowp Raciu16.6 km3,652330primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROWP Baleni · ROWP_66198_01 report?

Reported size: 8,930 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.