Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP ROWP Dumbrava · ROWP_133090_01

Romania · official identifier ROWP_133090_01

2,500h-e design capacity (2022) · 1048th of 1,622 (tied with 39 others)

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_133090_01 · reported size 2,500 h-e design capacity · data year 2022. 1048th of 1,622 records with reported size in the inventory of Romania (tied with 39 others); 0.01 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.4 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,500h-e design capacity
1048th of 1,622by reported size among the 1,622 records with a size in the inventory (tied with 39 others) · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates44.8710, 26.1920 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Barcanesti8.4 km500325primary
Rowp Valea Calugareasca8.9 km7,9483,158primary and secondary
Rowp Primaria Puchenii Mari9.9 km500539primary
Rowp Rasp Ploiesti10.2 km216,000132,742primary
Rowp Primaria Bucov11.2 km8,500156primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROWP Dumbrava · ROWP_133090_01 report?

Reported size: 2,500 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.