Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP ROWP Gruiu

Romania · official identifier ROWP_103513_01

10,610h-e design capacity (2022) · 215th of 1,622

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_103513_01 · reported size 10,610 h-e design capacity · data year 2022. 215th of 1,622 records with reported size in the inventory of Romania; 0.05 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

10,610h-e design capacity
215th of 1,622by reported size among the 1,622 records with a size in the inventory · 0.05 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates44.7230, 26.2270 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Prod Service Act Snagov2.4 km7,5002,765primary and secondary
Rowp Cl Moara Vlasiei8.8 km5,800299primary, secondary and tertiary
Rowp Gorgota (Fanari)12.7 km4,1342,600primary and secondary
Sect.Fierbinti12.8 km9,2651,421primary and secondary
Rowp Primaria Balotesti13.4 km5,0003,098primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROWP Gruiu report?

Reported size: 10,610 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.