Worldwide wastewater treatment observatory · Romania

Aguas SB Observatory · public data to understand water

WWTP ROWP UAT FILIPESTI - SEAU FILIPESTI

Romania · official identifier ROWP_22585_01

4,200h-e design capacity (2022) · 613th of 1,622 (tied with 7 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_22585_01 · reported size 4,200 h-e design capacity · received load 188 h-e · reported treatment: PS · data year 2022. 613th of 1,622 records with reported size in the inventory of Romania (tied with 7 others); 0.02 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

4,200h-e design capacity
188h-e received load (2022)
4 %reported load/capacity ratio (not hydraulic utilisation)
613th of 1,622by reported size among the 1,622 records with a size in the inventory (tied with 7 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.7475, 26.8841 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Romania

Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

12,443reference kWh per year for this load
147.3kWh per h-e (average load) per year
1,866€ per year at 0.15 €/kWh
31 %share of energy used for aeration

what this estimate is · Inputs: 188 p.e. of reported load; equivalent average load 85 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (30 m³/day of reference), not measured or available for reclamation.

LOCATION

Romania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Rowp Damienesti8.5 km1,814274primary and secondary
Rowp Secuieni12.3 km3,800486primary and secondary
Centru Zonal Judet Bacau - Sectia Buhusi14.4 km32,4818,591primary, secondary and tertiary
Centrul Zonal Judet Bacau - Seau Saucesti15.0 km3,500268primary and secondary
Centrul Zonal Judet Bacau - Seau Traian17.6 km4,360333primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROWP UAT FILIPESTI - SEAU FILIPESTI report?

Reported size: 4,200 h-e design capacity. Received load: 188 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ROWP UAT FILIPESTI - SEAU FILIPESTI?

Aguas SB simulator reference scenario for 188 p.e. of reported load: 12,443 kWh per year (147.3 kWh per p.e. of average load), with aeration as 31 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.