WWTP SCHITU GOLESTI
Romania · official identifier ROWP_18689_01
4,500h-e design capacity (2022) · 560th of 1,622 (tied with 28 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_18689_01 · reported size 4,500 h-e design capacity · received load 101 h-e · reported treatment: PST · data year 2022. 560th of 1,622 records with reported size in the inventory of Romania (tied with 28 others); 0.02 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.5 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.1633, 24.9957 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 101 p.e. of reported load; equivalent average load 45 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (16 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rowp Primaria Aninoasa (Sat Aninoasa) | 6.5 km | 350 | 8 | primary, secondary and tertiary |
| Campulung | 9.2 km | 64,800 | 11,531 | primary and secondary |
| Rowp Boteni | 9.6 km | 1,500 | 286 | primary, secondary and tertiary |
| Rowp Stalpeni (Sat Radesti) | 9.8 km | 1,300 | 200 | primary, secondary and tertiary |
| Rowp Rucar | 10.6 km | 8,500 | 684 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SCHITU GOLESTI report?
Reported size: 4,500 h-e design capacity. Received load: 101 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SCHITU GOLESTI?
Aguas SB simulator reference scenario for 101 p.e. of reported load: 6,636 kWh per year (147.3 kWh per p.e. of average load), with aeration as 31 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS