Worldwide wastewater treatment observatory · Romania
Aguas SB Observatory · public data to understand water
WWTP SECT CHIOJDU
Romania · official identifier ROWP_46180_01
800h-e design capacity (2022) · 1493rd of 1,622 (tied with 9 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_46180_01 · reported size 800 h-e design capacity · received load 421 h-e · reported treatment: PS · data year 2022. 1493rd of 1,622 records with reported size in the inventory of Romania (tied with 9 others); < 0.01 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.3524, 26.2126 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 421 p.e. of reported load; equivalent average load 189 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (67 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Sect Nehoiu-Paltineni | 10.2 km | 11,150 | 3,113 | primary, secondary and tertiary |
| Sect Patarlagele | 12.6 km | 4,800 | 1,773 | primary, secondary and tertiary |
| Rowpi Siriu | 15.4 km | 1,000 | 1,000 | primary and secondary |
| Maneciu Sector Maneciu Ungureni | 16.2 km | 2,500 | 285 | primary, secondary and tertiary |
| Maneciu Sector Maneciu Pamanteni | 16.4 km | 2,500 | 32 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SECT CHIOJDU report?
Reported size: 800 h-e design capacity. Received load: 421 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SECT CHIOJDU?
Aguas SB simulator reference scenario for 421 p.e. of reported load: 19,685 kWh per year (104.3 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.