Worldwide wastewater treatment observatory · Romania
Aguas SB Observatory · public data to understand water
WWTP SLATINA
Romania · official identifier ROWP_125356_01
71,700h-e design capacity (2022) · 58th of 1,622
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_125356_01 · reported size 71,700 h-e design capacity · received load 60,293 h-e · reported treatment: PST · data year 2022. 58th of 1,622 records with reported size in the inventory of Romania; 0.31 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.5 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 44.4130, 24.3950 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 60,293 p.e. of reported load; equivalent average load 27,172 p.e. with the reference profile of Romania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (9,647 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rowp Slatioara (Ot) | 7.5 km | 2,520 | 1,456 | primary and secondary |
| Rowp Teslui | 11.5 km | 1,000 | 745 | primary and secondary |
| Olt Piatra Olt | 12.0 km | 8,000 | 1,098 | primary and secondary |
| Rowp St.Ep.3- Cepari | 18.1 km | 600 | 38 | primary and secondary |
| Rowp Osica de Sus, Vladuleni | 19.0 km | 3,200 | 1,760 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SLATINA report?
Reported size: 71,700 h-e design capacity. Received load: 60,293 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SLATINA?
Aguas SB simulator reference scenario for 60,293 p.e. of reported load: 1,483,748 kWh per year (54.6 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.