Worldwide wastewater treatment observatory · Slovakia
Aguas SB Observatory · public data to understand water
WWTP COV Dolny Kubin
Slovakia · official identifier SKCAO50301125095401
23,000h-e design capacity (2022) · 61st of 275
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO50301125095401 · reported size 23,000 h-e design capacity · received load 19,687 h-e · reported treatment: PST · data year 2022. 61st of 275 records with reported size in the inventory of Slovakia; 0.35 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.0 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.2092, 19.2766 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Slovakia
Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 19,687 p.e. of reported load; equivalent average load 19,695 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,863 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Zaskov | 6.0 km | 325 | 27 | primary and secondary |
| Cov Rojkov | 11.0 km | 4,103 | 3,340 | primary and secondary |
| Cov Ruzomberok | 12.4 km | 623,774 | 377,950 | primary and secondary |
| Cov Lucky - Mockov | 14.1 km | 3,393 | 3,651 | primary and secondary |
| Cov Liptovska Tepla | 15.8 km | 8,136 | 5,054 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Dolny Kubin report?
Reported size: 23,000 h-e design capacity. Received load: 19,687 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Dolny Kubin?
Aguas SB simulator reference scenario for 19,687 p.e. of reported load: 928,628 kWh per year (47.2 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.