Worldwide wastewater treatment observatory · Slovakia

Aguas SB Observatory · public data to understand water

WWTP COV Duslo Sala, a.s.

Slovakia · official identifier SKCAO40500805040253

264,000h-e design capacity (2022) · 3rd of 275

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO40500805040253 · reported size 264,000 h-e design capacity · received load 11,981 h-e · reported treatment: PST · data year 2022. 3rd of 275 records with reported size in the inventory of Slovakia; 4.0 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

264,000h-e design capacity
11,981h-e received load (2022)
5 %reported load/capacity ratio (not hydraulic utilisation)
3rd of 275by reported size among the 275 records with a size in the inventory · 4.0 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates48.1731, 17.9396 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2022-03-09 · On 9 March 2022, the integrated environmental permit for the Dusantox wastewater treatment facility in Šaľa was amended. Slovak Environmental Inspectorate

Other published data

Mean annual volume treated reported in the 2022 cycle4,963,671 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Slovakia

Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

571,442reference kWh per year for this load
47.7kWh per h-e (average load) per year
85,716€ per year at 0.15 €/kWh
45 %share of energy used for aeration

what this estimate is · Inputs: 11,981 p.e. of reported load; equivalent average load 11,984 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (2,959 m³/day of reference), not measured or available for reclamation.

LOCATION

Slovakia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Sala Veca3.4 km15,00011,191primary, secondary and tertiary
Cov Sala5.3 km30,00018,778primary, secondary and tertiary
Cov Selice9.1 km3,4712,017primary, secondary and tertiary
Cov Cabaj - Capor9.9 km2,5501,484primary and secondary
Cov Mojmirovce10.2 km2,6703,122primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Duslo Sala, a.s. report?

Reported size: 264,000 h-e design capacity. Received load: 11,981 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Duslo Sala, a.s.?

Aguas SB simulator reference scenario for 11,981 p.e. of reported load: 571,442 kWh per year (47.7 kWh per p.e. of average load), with aeration as 45 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.