WWTP COV Koksov - Baksa

Slovakia · official identifier SKCAO80502045990931

175,104h-e design capacity (2022) · 8th of 275

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO80502045990931 · reported size 175,104 h-e design capacity · received load 104,325 h-e · reported treatment: PST · data year 2022. 8th of 275 records with reported size in the inventory of Slovakia; 2.7 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.7 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

175,104h-e design capacity
104,325h-e received load (2022)
60 %reported load/capacity ratio (not hydraulic utilisation)
8th of 275by reported size among the 275 records with a size in the inventory · 2.7 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.6587, 21.3080 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2023 · A project to expand the Košice wastewater treatment plant near Kokšov-Bakša was documented for environmental assessment. Slovak Environment Agency

Other published data

Mean annual volume treated reported in the 2022 cycle21,376,750 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Slovakia

Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,771,619reference kWh per year for this load
36.1kWh per h-e (average load) per year
565,743€ per year at 0.15 €/kWh
53 %share of energy used for aeration

what this estimate is · Inputs: 104,325 p.e. of reported load; equivalent average load 104,360 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

9.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (25,768 m³/day of reference), not measured or available for reclamation.

LOCATION

Slovakia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Cana6.7 km7,5003,079primary, secondary and tertiary
Cov Kosicka Nova Ves7.2 km2,000950primary, secondary and tertiary
Cov Saca10.9 km9,2772,676primary, secondary and tertiary
Cov Kechnec - Milhost14.0 km7,2001,632primary and secondary
Cov Druzstevna Pri Hornade15.1 km3,800880primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Koksov - Baksa report?

Reported size: 175,104 h-e design capacity. Received load: 104,325 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Koksov - Baksa?

Aguas SB simulator reference scenario for 104,325 p.e. of reported load: 3,771,619 kWh per year (36.1 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.