Worldwide wastewater treatment observatory · Slovakia
Aguas SB Observatory · public data to understand water
WWTP COV Kovarce
Slovakia · official identifier SKCAO40604585430711
1,600h-e design capacity (2022) · 241st of 275
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO40604585430711 · reported size 1,600 h-e design capacity · received load 818 h-e · reported treatment: PST · data year 2022. 241st of 275 records with reported size in the inventory of Slovakia; 0.02 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.5012, 18.1513 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Slovakia
Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 818 p.e. of reported load; equivalent average load 818 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (202 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Topolcany | 4.7 km | 58,386 | 31,593 | primary, secondary and tertiary |
| Cov Bojna | 7.5 km | 1,988 | 1,946 | primary, secondary and tertiary |
| Cov Hrusovany | 7.7 km | 3,800 | 824 | primary, secondary and tertiary |
| Cov Chynorany | 14.6 km | 2,500 | 1,075 | primary, secondary and tertiary |
| Cov Partizanske | 19.5 km | 30,864 | 21,339 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Kovarce report?
Reported size: 1,600 h-e design capacity. Received load: 818 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Kovarce?
Aguas SB simulator reference scenario for 818 p.e. of reported load: 46,328 kWh per year (56.6 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.