Worldwide wastewater treatment observatory · Slovakia
Aguas SB Observatory · public data to understand water
WWTP COV Leopoldov - nova
Slovakia · official identifier SKCAO20302725072532
5,500h-e design capacity (2022) · 125th of 275 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO20302725072532 · reported size 5,500 h-e design capacity · received load 5,447 h-e · reported treatment: PST · data year 2022. 125th of 275 records with reported size in the inventory of Slovakia (tied with 1 others); 0.08 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.4396, 17.7784 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Slovakia
Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 5,447 p.e. of reported load; equivalent average load 5,447 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,345 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Hlohovec | 3.0 km | 27,500 | 29,693 | primary, secondary and tertiary |
| Cov Velke Kostolany | 7.9 km | 3,000 | 1,596 | primary and secondary |
| Cov Jaslovske Bohunice | 9.8 km | 5,550 | 7,128 | primary, secondary and tertiary |
| Cov Vesele | 12.3 km | 1,440 | 2,527 | primary and secondary |
| Cov Piestany | 14.1 km | 70,300 | 32,474 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Leopoldov - nova report?
Reported size: 5,500 h-e design capacity. Received load: 5,447 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Leopoldov - nova?
Aguas SB simulator reference scenario for 5,447 p.e. of reported load: 270,360 kWh per year (49.6 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.