Worldwide wastewater treatment observatory · Slovakia

Aguas SB Observatory · public data to understand water

WWTP COV Podbanske

Slovakia · official identifier SKCAO70605775601032

1,243h-e design capacity (2022) · 247th of 275

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO70605775601032 · reported size 1,243 h-e design capacity · received load 3,319 h-e · reported treatment: PS · data year 2022. 247th of 275 records with reported size in the inventory of Slovakia; 0.02 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,243h-e design capacity
3,319h-e received load (2022)
267 %reported load/capacity ratio (not hydraulic utilisation)
247th of 275by reported size among the 275 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates49.1335, 19.8942 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Slovakia

Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

163,663reference kWh per year for this load
49.3kWh per h-e (average load) per year
24,549€ per year at 0.15 €/kWh
69 %share of energy used for aeration

what this estimate is · Inputs: 3,319 p.e. of reported load; equivalent average load 3,321 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (820 m³/day of reference), not measured or available for reclamation.

LOCATION

Slovakia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Vazec9.8 km2,4112,506primary, secondary and tertiary
Cov Hybe11.7 km2,3002,626primary, secondary and tertiary
Cov Strbske Pleso13.1 km8,5001,963primary and secondary
Cov Liptovska Teplicka22.5 km2,7001,302primary and secondary
Cov Liptovsky Mikulas22.5 km126,400179,702primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Podbanske report?

Reported size: 1,243 h-e design capacity. Received load: 3,319 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Podbanske?

Aguas SB simulator reference scenario for 3,319 p.e. of reported load: 163,663 kWh per year (49.3 kWh per p.e. of average load), with aeration as 69 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.