WWTP COV Rudnany
Slovakia · official identifier SKCAO81006465435191
5,000h-e design capacity (2022) · 134th of 275 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO81006465435191 · reported size 5,000 h-e design capacity · received load 823 h-e · reported treatment: P · data year 2022. 134th of 275 records with reported size in the inventory of Slovakia (tied with 3 others); 0.08 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.7 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.8882, 20.6756 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Slovakia
Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 823 p.e. of reported load; equivalent average load 822 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (203 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Markusovce | 4.8 km | 780 | 229 | primary and secondary |
| Cov Nalepkovo | 6.3 km | 2,200 | 453 | primary, secondary and tertiary |
| Cov Spisska Nova Ves | 8.0 km | 48,024 | 38,430 | primary, secondary and tertiary |
| Cov Spisske Podhradie | 12.6 km | 4,500 | 978 | primary, secondary and tertiary |
| Cov Levoca | 15.7 km | 9,500 | 7,377 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Rudnany report?
Reported size: 5,000 h-e design capacity. Received load: 823 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Rudnany?
Aguas SB simulator reference scenario for 823 p.e. of reported load: 46,507 kWh per year (56.6 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.