Worldwide wastewater treatment observatory · Slovakia
Aguas SB Observatory · public data to understand water
WWTP COV Udica - Centrum
Slovakia · official identifier SKCAO30603445137413
600h-e design capacity (2022) · 262nd of 275
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SKCAO30603445137413 · reported size 600 h-e design capacity · received load 137 h-e · reported treatment: PST · data year 2022. 262nd of 275 records with reported size in the inventory of Slovakia; < 0.01 % of the sum of those 275 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.1 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.1630, 18.4025 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Slovakia
Regulatory framework of Slovakia · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 137 p.e. of reported load; equivalent average load 138 p.e. with the reference profile of Slovakia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (34 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Udica II | 0.1 km | 125 | 15 | primary and secondary |
| Cov Udica i | 0.5 km | 140 | 103 | primary and secondary |
| Cov Povazska Bystrica | 3.5 km | 47,000 | 33,352 | primary, secondary and tertiary |
| Cov Dolna Marikova | 4.3 km | 800 | 550 | primary and secondary |
| Cov Puchov - Strezenice | 10.0 km | 30,000 | 19,410 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Udica - Centrum report?
Reported size: 600 h-e design capacity. Received load: 137 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Udica - Centrum?
Aguas SB simulator reference scenario for 137 p.e. of reported load: 14,606 kWh per year (106.1 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.