Worldwide wastewater treatment observatory · Sweden
Aguas SB Observatory · public data to understand water
WWTP BjOrklinge Avloppsreningsverk
Sweden · official identifier SE0380-50-005
6,760h-e design capacity (2022) · 268th of 434
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SE0380-50-005 · reported size 6,760 h-e design capacity · received load 3,800 h-e · reported treatment: PS · data year 2022. 268th of 434 records with reported size in the inventory of Sweden; 0.05 % of the sum of those 434 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.0208, 17.5427 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Sweden
Regulatory framework of Sweden · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,800 p.e. of reported load; equivalent average load 3,799 p.e. with the reference profile of Sweden (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (901 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Storvreta Avloppsreningsverk | 10.6 km | 9,800 | 6,800 | primary and secondary |
| Uppsala Avloppsreningsverk | 20.7 km | 200,000 | 220,700 | primary and secondary |
| Ostervala Avloppsreningsverk | 25.7 km | 5,000 | 2,850 | primary and secondary |
| Osterbybruks Avloppsreningsvrk | 28.5 km | 3,400 | 1,656 | primary and secondary |
| Alunda Avloppsreningsverk | 29.8 km | 2,000 | 1,411 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BjOrklinge Avloppsreningsverk report?
Reported size: 6,760 h-e design capacity. Received load: 3,800 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of BjOrklinge Avloppsreningsverk?
Aguas SB simulator reference scenario for 3,800 p.e. of reported load: 184,386 kWh per year (48.5 kWh per p.e. of average load), with aeration as 70 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.