Worldwide wastewater treatment observatory · Sweden
Aguas SB Observatory · public data to understand water
WWTP Kavaheden avr
Sweden · official identifier SE2523-01
27,000h-e design capacity (2022) · 98th of 434 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier SE2523-01 · reported size 27,000 h-e design capacity · received load 11,800 h-e · reported treatment: PS · data year 2022. 98th of 434 records with reported size in the inventory of Sweden (tied with 1 others); 0.19 % of the sum of those 434 records in h-e (sum of records, not national capacity); nearest inventoried plant at 72.3 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 67.1529, 20.7372 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Sweden
Regulatory framework of Sweden · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 11,800 p.e. of reported load; equivalent average load 11,794 p.e. with the reference profile of Sweden (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,797 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Jokkmokk Avr | 72.3 km | 5,000 | 700 | primary and secondary |
| Kiruna Avr | 78.4 km | 31,000 | 16,000 | primary and secondary |
| Pajala Avr | 114.5 km | 2,400 | 2,300 | primary and secondary |
| Overkalix Avr | 131.6 km | 4,000 | 2,000 | primary and secondary |
| Overtornea Avr | 154.5 km | 5,700 | 3,000 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Kavaheden avr report?
Reported size: 27,000 h-e design capacity. Received load: 11,800 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Kavaheden avr?
Aguas SB simulator reference scenario for 11,800 p.e. of reported load: 553,799 kWh per year (47.0 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.