Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP ARA Buholz / ARA REAL

Switzerland · official identifier CH_WWTP_102400

270,000h-e design capacity (2022) · 9th of 705

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_102400 · reported size 270,000 h-e design capacity · received load 215,205 h-e · reported treatment: PST · data year 2022. 9th of 705 records with reported size in the inventory of Switzerland; 1.6 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

270,000h-e design capacity
215,205h-e received load (2022)
80 %reported load/capacity ratio (not hydraulic utilisation)
9th of 705by reported size among the 705 records with a size in the inventory · 1.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.0894, 8.3191 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2024 · At the end of 2024, the municipality of Schwarzenberg was connected to the Buholz wastewater treatment plant. City of Lucerne

Other published data

Mean annual volume treated reported in the 2022 cycle36,599,323 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

8,046,570reference kWh per year for this load
33.1kWh per h-e (average load) per year
1,206,985€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 215,205 p.e. of reported load; equivalent average load 242,955 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

26.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (72,524 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Kläranlage Oberseetal3.9 km18,00013,656primary, secondary and tertiary
Kläranlage Rontal6.1 km47,00038,100primary, secondary and tertiary
Kläranlage Hochdorf10.1 km22,50014,833primary, secondary and tertiary
Kläranlage Sempach-Neuenkirch10.6 km15,4009,898primary, secondary and tertiary
Oberrueti11.3 km2,4492,316primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ARA Buholz / ARA REAL report?

Reported size: 270,000 h-e design capacity. Received load: 215,205 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ARA Buholz / ARA REAL?

Aguas SB simulator reference scenario for 215,205 p.e. of reported load: 8,046,570 kWh per year (33.1 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.