Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP Bregaglia
Switzerland · official identifier CH_WWTP_379205
4,500h-e design capacity (2022) · 374th of 705 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_379205 · reported size 4,500 h-e design capacity · received load 1,032 h-e · reported treatment: PST · data year 2022. 374th of 705 records with reported size in the inventory of Switzerland (tied with 3 others); 0.03 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.5 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.3399, 9.5775 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,032 p.e. of reported load; equivalent average load 1,166 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (348 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Avers (Loretsch Hus) | 12.5 km | 250 | 48 | primary and secondary |
| Avers (Cresta) | 15.5 km | 228 | 21 | primary and secondary |
| Sils I.E./Segl (Fex) | 16.6 km | 750 | 19 | primary, secondary and tertiary |
| Surses (Bivio) | 16.6 km | 1,000 | 182 | primary, secondary and tertiary |
| Surses (Sur) | 20.2 km | 250 | 67 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Bregaglia report?
Reported size: 4,500 h-e design capacity. Received load: 1,032 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Bregaglia?
Aguas SB simulator reference scenario for 1,032 p.e. of reported load: 63,576 kWh per year (54.5 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.