Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP Briglina-Brig

Switzerland · official identifier CH_WWTP_600200

55,000h-e design capacity (2022) · 72nd of 705

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_600200 · reported size 55,000 h-e design capacity · received load 44,445 h-e · reported treatment: PST · data year 2022. 72nd of 705 records with reported size in the inventory of Switzerland; 0.33 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.1 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

55,000h-e design capacity
44,445h-e received load (2022)
81 %reported load/capacity ratio (not hydraulic utilisation)
72nd of 705by reported size among the 705 records with a size in the inventory · 0.33 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.3072, 7.9516 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,201,135reference kWh per year for this load
43.9kWh per h-e (average load) per year
330,170€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 44,445 p.e. of reported load; equivalent average load 50,176 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

5.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (14,978 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Regionale Ara-Visp7.1 km388,833196,832primary, secondary and tertiary
Simplon-Pass8.6 km50011primary and secondary
Stalden9.2 km8,2502,964primary, secondary and tertiary
Unterbäch11.9 km3,750884primary, secondary and tertiary
Eisten12.6 km400140primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Briglina-Brig report?

Reported size: 55,000 h-e design capacity. Received load: 44,445 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Briglina-Brig?

Aguas SB simulator reference scenario for 44,445 p.e. of reported load: 2,201,135 kWh per year (43.9 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.