WWTP CHAM(SCHOENAU)

Switzerland · official identifier CH_WWTP_170200

245,000h-e design capacity (2022) · 10th of 705

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_170200 · reported size 245,000 h-e design capacity · received load 147,901 h-e · reported treatment: PST · data year 2022. 10th of 705 records with reported size in the inventory of Switzerland; 1.5 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.8 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

245,000h-e design capacity
147,901h-e received load (2022)
60 %reported load/capacity ratio (not hydraulic utilisation)
10th of 705by reported size among the 705 records with a size in the inventory · 1.5 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.1986, 8.4416 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1998 · In 1998, the expansion of the central Schönau plant in Cham, which receives wastewater from the Lake Zug ring sewer, was completed. Canton of Zug

Other published data

Mean annual volume treated reported in the 2022 cycle21,338,292 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,717,968reference kWh per year for this load
34.2kWh per h-e (average load) per year
857,695€ per year at 0.15 €/kWh
52 %share of energy used for aeration

what this estimate is · Inputs: 147,901 p.e. of reported load; equivalent average load 166,974 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

18.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (49,843 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Knonau2.8 km7,0005,930primary, secondary and tertiary
Sins3.1 km10,73510,115primary, secondary and tertiary
Oberrueti4.1 km2,4492,316primary, secondary and tertiary
Hausen7.6 km4,5003,071primary, secondary and tertiary
Obfelden7.7 km7,0006,881primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CHAM(SCHOENAU) report?

Reported size: 245,000 h-e design capacity. Received load: 147,901 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CHAM(SCHOENAU)?

Aguas SB simulator reference scenario for 147,901 p.e. of reported load: 5,717,968 kWh per year (34.2 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.