Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP Embd

Switzerland · official identifier CH_WWTP_628300

600h-e design capacity (2022) · 602nd of 705 (tied with 8 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_628300 · reported size 600 h-e design capacity · received load 264 h-e · reported treatment: PST · data year 2022. 602nd of 705 records with reported size in the inventory of Switzerland (tied with 8 others); < 0.01 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.5 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

600h-e design capacity
264h-e received load (2022)
44 %reported load/capacity ratio (not hydraulic utilisation)
602nd of 705by reported size among the 705 records with a size in the inventory (tied with 8 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.2171, 7.8414 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

22,294reference kWh per year for this load
74.8kWh per h-e (average load) per year
3,344€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 264 p.e. of reported load; equivalent average load 298 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (89 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Graechen2.5 km15,7501,987primary, secondary and tertiary
St-Niklaus3.8 km5,8751,999primary, secondary and tertiary
Stalden3.9 km8,2502,964primary, secondary and tertiary
Eisten4.3 km400140primary and secondary
Saastal7.7 km27,3676,143primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Embd report?

Reported size: 600 h-e design capacity. Received load: 264 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Embd?

Aguas SB simulator reference scenario for 264 p.e. of reported load: 22,294 kWh per year (74.8 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.