Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP FEHRALTORF
Switzerland · official identifier CH_WWTP_017201
12,000h-e design capacity (2022) · 251st of 705 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_017201 · reported size 12,000 h-e design capacity · received load 15,648 h-e · reported treatment: PST · data year 2022. 251st of 705 records with reported size in the inventory of Switzerland (tied with 3 others); 0.07 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.7 km · 10 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.3917, 8.7399 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 15,648 p.e. of reported load; equivalent average load 17,665 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (5,273 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pfaeffikon | 3.7 km | 17,000 | 16,798 | primary, secondary and tertiary |
| Uster | 5.8 km | 48,000 | 33,443 | primary, secondary and tertiary |
| Illnau-Effretikon(Mannenberg) | 5.9 km | 22,600 | 16,668 | primary, secondary and tertiary |
| Maur | 7.4 km | 7,200 | 5,506 | primary, secondary and tertiary |
| Faellanden(Bachwis) | 7.4 km | 45,000 | 48,862 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP FEHRALTORF report?
Reported size: 12,000 h-e design capacity. Received load: 15,648 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of FEHRALTORF?
Aguas SB simulator reference scenario for 15,648 p.e. of reported load: 886,566 kWh per year (50.2 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.