Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP GAENSBRUNNEN

Switzerland · official identifier CH_WWTP_242300

375h-e design capacity (2022) · 653rd of 705 (tied with 12 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_242300 · reported size 375 h-e design capacity · received load 44 h-e · reported treatment: PS · data year 2022. 653rd of 705 records with reported size in the inventory of Switzerland (tied with 12 others); < 0.01 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

375h-e design capacity
44h-e received load (2022)
12 %reported load/capacity ratio (not hydraulic utilisation)
653rd of 705by reported size among the 705 records with a size in the inventory (tied with 12 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates47.2647, 7.4664 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

6,618reference kWh per year for this load
131.7kWh per h-e (average load) per year
993€ per year at 0.15 €/kWh
32 %share of energy used for aeration

what this estimate is · Inputs: 44 p.e. of reported load; equivalent average load 50 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (15 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ruettenen6.6 km3,1251,213primary, secondary and tertiary
Bellach(Be-Lomm.-Lan.)6.9 km13,7507,478primary, secondary and tertiary
Selzach7.4 km6,9003,073primary, secondary and tertiary
Roches(Moutier Seme)7.6 km16,0006,721primary, secondary and tertiary
Feldbrunnen-St. Niklaus8.6 km1,625802primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GAENSBRUNNEN report?

Reported size: 375 h-e design capacity. Received load: 44 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of GAENSBRUNNEN?

Aguas SB simulator reference scenario for 44 p.e. of reported load: 6,618 kWh per year (131.7 kWh per p.e. of average load), with aeration as 32 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.